TrailheadFishing OperationsField Delivery and Evidence
FD-04AdaptNo assistant eval · Coverage unknown

Change the Program Beat After an Incident

Move the active Fishing Program to a safe same-lodge Beat while preserving the planned Beat and the reason for the change.

Track

Field Delivery and Evidence

Phase

Adapt

Starts with

An approved Fishing Program is in progress on its planned or current Beat

Ends with

The Program, timeline, draft report, and Operations view share one current Beat

Switch an active Fishing Program after a safe test incident and verify that every downstream view uses the new current Beat.

Before you start

Act as
The guide assigned to the active Fishing Program
Starting state
The Program is approved and in progress, with no submitted Fishing Report
Test data
At least one other active Beat belongs to the same lodge

Run the scenario

  1. 1GuideTrailhead Mobile · Program timeline

    After starting the Program, select Change Beat due to incident.

    Expected evidence

    The flow opens with a searchable list of active same-lodge Beats and no oversized current-Beat card.

  2. 2GuideTrailhead Mobile · Change Beat

    Select a different Beat, continue, choose Access closed, and add a short test note.

    Expected evidence

    The motive is collected after Beat selection, where the Beat list cannot cover it.

  3. 3GuideTrailhead Mobile · Review Beat change

    Verify the current-to-new move, motive, note, and listed effects, then confirm once.

    Expected evidence

    The Program immediately shows the new current Beat, preserves the planned Beat, records a localized timeline message, and requires no Operations approval.

  4. 4GuideTrailhead Mobile · Fishing Report

    Open the linked report and submit an accurate test outcome, with or without catches and photos.

    Expected evidence

    The report shows the Program's current Beat without an independent picker; submitted evidence cannot contradict the Program Beat.

Scenario completed

The Program, timeline, draft report, and Operations view share one current Beat

Current Program Beat
Previous effective BeatSelected same-lodge Beat
Linked draft Fishing Report
Previous effective BeatCurrent Program Beat

If it does not match

  • A submitted Fishing Report locks further Beat changes; correct the report through the supported correction flow instead of changing the Program behind submitted evidence.
  • If the target Beat is inactive, belongs to another lodge, or current Program data changed, refresh and choose a currently eligible Beat instead of forcing the mutation.